ABSTRACT

This thesis report is properly documented to facilitate the presentation of the proposed fire service station.

The existence of fire service station in Nigeria and its system of operation which enhances the design of proposed station. Although there are some various problems which are to be tackled like circulation, zoning and other services.

Nevertheless there are several goals that are achieve through the study and design of fire station by providing good circulation system, adequate services and good elevation that will help to promote the confidence and trust of the people.

All these are achieve through proper integration of the background study of fire station, creation of possible entrance of fire appliance different from its exit and also through installation of water hydrant and overhead tanks at appropriate location within the site to enhance sufficient water supply.

Furthermore the result of the design report was comprehensive and legible for easy understanding of fire station, its purpose and method of operation.

Finally if all this are integrated into the design, the station will achieve its aim and good working environment.

TABLE OF CONTENT

Title page ………………………………………………………………………………………………………………………. i

Certification …………………………………………………………………………………………………………………… ii

Dedication ……………………………………………………………………………………………………………………… iii

Acknowledgement …………………………………………………………………………………………………………. iv

Abstract………………………………………………………………………………………………………………………….. v

Table of content …………………………………………………………………………………………………………….. vi

CHAPTER ONE

Introduction

1.0  Introduction…………………………………………………………………………………………………………… 1

1.1     Problem statement………………………………………………………………………………………………. 1

1.2     Goals of the project design……………………………………………………………………………..……. 1

1.3      Aim……………………………………………………………………………………………………………..………. 2

1.4      Objective………………………………………………………………………………………………….…………. 3

1.5      Scope………………………………………………………………………………………………….………………..3

1.6     Motivation…………………………………………………………………………………………………………… 4

1.7     Research Methodology / Project design method………………………………………………….. 6

CHAPTER TWO

2.0       LITERATURE RE VIEW

2.1     Background information of existing fire service station…………………….……………………………… 7

  1. Historical development and trend in different part of the world……….…………………………….. 7

2.1.3    History of fire fighting in England…………………………………………………………………………………… 8

2.1.4    History of fire fighting in Nigeria…………………………………………………………………………………… 10                                                                                                                                                                          2.1.5     Types of fire service station building…………………………………………………………………………….. 11

2.1.6     Functions of fire station………………………………………………………………………………………………… 13

2.1.7     Mode of operation of fire service station ……………………………………………………………………… 14

2.1.8    Executive members of fire services station…………………………………………………………………….. 17

2.1.9    Policies of  fire service station ……………………………………………………………………………………….. 18

2.1.10  Events of the fire services station…………………………………………………………………………………… 19

2.1.11  Fire appliances……………………………………………………………………………………………………………….. 25

2.1.12  Uses of fire……………………………………………………………………………………………………………………… 28

2.1.13  Causes of fire………………………………………………………………………………………………………………….. 28

2.1.14   Hazard created by burning…………………………………………………………………………………………….. 30

2.1.15  Benefits of fire service station ….…………………………………………………………………………………….. 31

2.2 Planning considerations………….……….……………………………………………………………………………………. 32

2.3 Design considerations……………………….…………………………………………………………………………………… 34

2.4 Deduction from literature review….….……………………………………………………………………………………. 37

CHAPTER THREE

CASE STUDIES

3.1       Enugu state  fire service station………………………………………………………………………………… 38

3.1.1    Client……………………………………………………………………………………………………………………….. 39

3.1.2    Architect/ contractor ……………………………………………………………………………………………….. 39

3.1.3    Brief History …………………………………………………………………………………………………………….. 39

3.1.4    Location …………………………………………………………………………………………………………………… 39

3.1.5    Function …………………………………………………………………………………………………………………… 39

3.1.6    Programmed Element ………………………………………………………………………………………………. 40

3.1.7    Relationship between programmed element…………………………………………………………….. 40

3.1.8    Planning concept ………………………………………………………………………………………………………. 40

3.1.9    Environmental control ………………………………………………………………………………………………. 42

3.1.10  Service needed …………………………………………………………………………………………………………. 43

3.1.11  General Appraisal ……………………………………………………………………………………………………… 44

3.1.12  Construction materials and method ………………………………………………………………………….. 44

3.1.13  Merits………………………………………………………………………………………………………………………… 45

3.1.14  Demerits……………………………………………………………………………………………………………………. 45

3.1.15  Deduction………………………………………………………………………………………………………………….. 46

CASE STUDY TWO

3.2       Owerri Fire Service Station………………………………………………………………………………………….. 47

3.2.1    Client …………………………………………………………………………………………………………………………. 47

3.2.2    Architect/ contractor …………………………………………………………………………………………………. 47

3.2.3    Brief  History………………………………………………………………………………………………………………. 48

3.2.4    Location……………………………………………………………………………………………………………………… 48

3.2.5    Function ………………………………………………………………………………………….…………………………. 48

3.2.6    Programmed element ……………………………………………………………………….……………………….. 48

3.2.7    Relationship between programmed element……………………………………….……………………… 48

3.2.8    Planning Concept …………………………………………………………………………………..……………………. 49

3.2.9    Environmental control …………………………………………………………………………………………………. 49

3.2.10  Services needed …………………………………………………………………………………………………………… 50

3.2.11  General Appraisals ………………………………………………………………………………………………………. 50

3.2.12  Construction materials and methods ………………………………………………………………….………… 51

3.2.13  Merits…………………………………………………………………………………………………………………….…….. 51

3.2.14  Demerits…………………………………………………………………………………………………………………….…. 52

3.2.15  Deductions…………………………………………………………………………………………………………………….. 52

FOREIGN CASE STUDIES

3.3         South Sea fire station Portsmouth England …………………………………………………………………… 53

3.3.1     Client ………………………………………………………………………………………………………………………..….. 54

3.3.2    Architect ………………………………………………………………………………………………………………..……… 54

3.3.3    Contractors ……………………………………………………………………………………………………………….….. 54

3.3.4     Design background ……………………………………………………………………………………………………….. 54

3.3.5     Location……………………………………………………………………………………………………………….……….. 55

3.3.6     Site and plan layout..…………………………………………………………………………………………………… 55

3.3.7     Scope……………………………………………………………………………………………………………………………. 55

3.3.8     General appraisal………………………………………………………………………………………………………….. 56

3.3.9     Structure……………………………………………………………………………………………………………………….. 56

3.3.10   Merit…………………………………………………………………………………………………………………………….. 57

3.3.11   Demerit…………………………………………………………………………………………………………………………. 57

3.3.12   Deduction………………………………………………………………………………………………………………………. 58

CHAPTER FOUR

PLANNING PROPOSALS

4.0          Location…………………………………………………………………………………………………………………………59

4.1          Accessibility…………………………………………………………………………………………………………….. 59

4.2          Service…………………………………………………………………………………………………………………….. 60

4.3          Climate…………………………………………………………………………………………………………………….. 61

4.4          Soil …………………………………………………………………………………………………………………………… 63

4.5          Vegetation………………………………………………………………………………………………………………… 64

4.6          Adjoining development…………………………………………………………………………………………….. 65

4.7          Topography……………………………………………………………………………………………………………….. 65

4.8          Environmental Impact assessment……………………………………………………………………………… 65

4.9          Structural morphology (road network) ……………………………………………………………………….. 66

4.10        Zoning of the site……………………………………………………………………………………………………….. 66

4.11        Architectural composition…………………………………………………………………………………………… 66

4.12        Site orientation…………………………………………………………………………………………………………… 67

4.13       Site selection criteria…………………………………………………………………………………………………… 67

4.14       Planning proposals……………………………………………………………………………………………………….. 68

CHAPTER FIVE

DESIGN CONSIDERATION

  1. Programmed element………………………………………………………………………………………………………………… 71

5.1 Spatial  requirement/ accommodation schedule ……………………………………………………………………… 72

  1. Relationship matrix…………………………………………………………………………………………………………………… 73
  2. Functional provision …………………………………………………………………………………………………………………… 73

5.4  Administrative department……………………………………………………………………………………………………….. 74

  1. Operation department……………………………………………………………………………………………………………… 76
  2. Training department……………………………………………..…………………………………………………………………. 77
  3. Design concepts……………………………………………………..………………………………………………………………… 79
  4. Structural resolution……………………….………………………………………………………………………………………… 79
  5. ……………………………………………………………………………………………………………………………………. 79
  6. Cost implication……………………………………………………………………………………………………………………… 79
  7. Design consideration……………………………………………………………………………………………………………… 80

5.12     Design proposals……………………………………………………………………………………………………………………. 83

5.13   Conclusion……………………………………………………………………………………………………………………………….. 84

Bibliography………………………………………………………………………………………………………………………………………. 85

CHAPTER ONE

1.0                            INTRODUCTION                                                                                                                                                 

Fire: A friend to man and a threat to humanity. The word “FIRE“is one of the most dreaded expressions in every language because it has proved to be as dangerous as its usefulness. Controlled fire is useful to man but uncontrolled fire is one of man’s worst enemies. Thousands of lives and properties are lost each year through uncontrolled fire.

1.1PROBLEM STATEMENT

Most of the fire service stations in the country are dilapidate, no architectural interest. Are mostly sited in the areas that are not located within the residential areas which are bound to have higher risk of fire outbreak.

Most of the fire service station does not have enough space for storage of chemicals and fire equipments.

There is no good integration of the building into the landscape and the urban area of the town.

1.2 GOALS OF THE PROJECT DESIGN

There are many goals to be fulfilled in the design of this fire station. Among these are:-

  1. Achievement of architectural aesthetics within the fire station.
  2. Achievement of ample space for effective maneuvering of vehicles within the station and in relation to the highway.
  3. Achievement of effective functional relationship in the various parts of the station.
  4. Achievement of good communication links within the station.

 

1.3AIM

Fire stations are functional building with strictly utilitarian emphasis. The main aim of this design is to provide a related, civilized atmosphere in the midst of a tough working environment that is a place where the workers can relax  and enjoy themselves when on stand by or off-duty.

To achieve this, the fire service station will be made to be as aesthetically appealing as possible. Recreation rooms and sports activities will also be provided as much as possible.

The landscape will be such as to create a relaxing effect and provide an atmosphere of privacy for the workers.

Another aim of this design is to solve the communication problems inherent in the design of a fire service station that is:

  1. To provide separate circulation systems for weary work stained firemen returning from calls or duty, architects going to the fire-preventing offices for approval of their drawings and other visitors calling at the station.
  2. Firemen should be able to leave and be on their way 30 to 45 second after receiving a fire alarm, in this regard,  the crew room, recreation room, control room and appliance bay should be designed in such a way that communication between  then will take as little time as possible.
  3. The vehicular access and exist points in the site should have enough radius curve and visibility to allow the vehicle to have a fast exist out of the station.

 

1.4OBJECTIVE

Objective of the fire station are to provide the following

  1. A good maintenance section,
  2. Provide rooms large enough for the storage of chemicals, fire extinguishers and other equipment
  3. To provide a drill tower which is architectural and a good training ground for the students and workers in the fire station.

 

1.5  SCOPE

There are many scope to be fulfilled in the design of this fire station. Among these are:

  1. Achievement of architectural aesthetics within the fire station.
  2. Achievement of ample space for effective movement of vehicles within the station and in relation to the highway.
  3. Integration of effective good communication links within the station.
  4. Integration of the fire station into a well landscape environment.
  5. Achievement of effective functional relationship in the various parts of the station.

1.6       MOTIVATION

The rate of increase in fire outbreak throughout Nigeria is becoming alarming especially during the dry season. There has been a steady increase in the number of lives lost and the amount of property damaged over the years.

Most Nigeria towns or city do not have well equipped fire station. The few places where fire station exists, the structures are totally unsuitable. The task of providing modern fire stations for effective fire coverage is important if the town and its inhabitants must sustain the advancement of the 20th century including large scale industrialization and commercial enterprises.

In most cases, Ogui fire station, Enugu State, it is appalling that the existing fire station is in its most rudimentary form. It lacks operational, administrative, training and recreational facilities. It is therefore calls for complete re-designing in order to save the state from its ever increasing annual loss of property from fire incident.

The aesthetic aspect of this fire station leaves a lot to be desired. The building has a square shape created for the storage of appliances and fire men. No attempt has been made to create any aesthetic appeal in the building.

Fire men are just like any other human being. They appreciate beautiful things and like to stay around them. The station is an alternative home for fire-men away from home and should be treated as such.

The boldness of the fire station is a different story altogether. Landscape and nature are not even considered as part of the design.

In all the fire stations, in the century, you can hardly see any trees or plants around the premises of the fire station. Human beings have a natural affinity to beautiful landscapes. It softens the rigidity of Architecture and creates a cool atmosphere for relaxation. The lack of Aesthetic appeal and landscape in our fire station are the most serious motivating factors that led me to choose the design topic ‘’fire service station for my project.

I intend to create a home, a relaxation center and an enjoyable working place for fire fighters.

We are always complaining of the inefficient of our fire-fighters. I believe that if good conditions are created for the fire fighters, efficient of the fire fighters will increase and so there will be reduction in the number of disastrous fire incident in the state.

 

 

 

 

 

 

 

 

1.7RESEARCH METHODOLOGY / PROJECT DESIGN METHOD

Several methods were used for a successful completion of this project. Among these are interviews, questionnaires, visit to fire stations and deductions from books and journals. The first step is to choose a site. I went to 9th mile caner Enugu, which is the location of the proposed fire service station and analyzed the proposed site. The site satisfied the requirement for a fire service station.

I visited the different station in the country including the existing Enugu fire service station, their training school and Owerri fire station. I conducted research in these stations through the use of these methods:

  1. QUESTIONAIRES: Questionnaires were given to the chief fire officers in the state to find out the existing conditions in the fire stations.
  2. INTERVIEWS: I interviewed some of the firemen, the students and the fire preventing officers.
  3. PICTURES: I conducted a tour of the fire service station and took several pictures. All these were combined together to get a comprehensive study of the fire service station merit and demerits.
  4. BOOK AND JOUNALS: I went through journals and studied examples of foreign case studies. I also did an appraisal of these fire station with as view to incorporate the merits in the propose fire service station website in other to incorporate the merits in the proposed fire service station design.
  5. INTERNET: I browse through different fire station website in other to incorporate the merit in the proposed fire service station design.

DOWNLOAD COMPLETE WORK

DISCLAIMER: All project works, files and documents posted on this website, eProjectTopics.com are the property/copyright of their respective owners. They are for research reference/guidance purposes only and some of the works may be crowd-sourced. Please don’t submit someone’s work as your own to avoid plagiarism and its consequences. Use it as a reference/citation/guidance purpose only and not copy the work word for word (verbatim). The paper should be used as a guide or framework for your own paper. The contents of this paper should be able to help you in generating new ideas and thoughts for your own study. eProjectTopics.com is a repository of research works where works are uploaded for research guidance. Our aim of providing this work is to help you eradicate the stress of going from one school library to another in search of research materials. This is a legal service because all tertiary institutions permit their students to read previous works, projects, books, articles, journals or papers while developing their own works. This is where the need for literature review comes in. “What a good artist understands is that nothing comes from nowhere. The paid subscription on eProjectTopics.com is a means by which the website is maintained to support Open Education. If you see your work posted here by any means, and you want it to be removed/credited, please contact us with the web address link to the work. We will reply to and honour every request. Please notice it may take up to 24 – 48 hours to process your request.

WeCreativez WhatsApp Support
Administrator (Online)
Hello and welcome. I am online and ready to help you via WhatsApp chat. Let me know if you need my assistance.